subject
Physics, 18.03.2021 01:30 bessieyounger1211

Timed Test A block with a mass of 2 kg is pushed
20 cm at a constant speed up an incline
that makes a 40° angle with the floor.
How much work is done by gravity
on the block? Let D be the displacement
of the block

2.521 J
-3.003 J
-252.1 J
-2.521 J

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 19:30
11. you want to calculate the displacement of an object thrown over a bridge. using -10 m/s2 for acceleration due to gravity, what would be the total displacement of the object if it took 8 seconds before hitting the water?
Answers: 1
question
Physics, 22.06.2019 02:20
Which changes of state do the labels represent? a: b: c:
Answers: 1
question
Physics, 22.06.2019 04:30
Erosion of the beach is normally a slow process. however, in certain situations, large chunks of shore may wash out to sea. what could cause this to happen?
Answers: 3
question
Physics, 22.06.2019 08:20
The two required components for a generator
Answers: 2
You know the right answer?
Timed Test A block with a mass of 2 kg is pushed
20 cm at a constant speed up an incline
Questions
question
Mathematics, 16.10.2020 15:01
question
Computers and Technology, 16.10.2020 15:01
question
Arts, 16.10.2020 15:01
question
Computers and Technology, 16.10.2020 15:01
question
English, 16.10.2020 15:01
Questions on the website: 13722367