subject
Physics, 25.02.2021 14:00 oylermorgan7687

If you lift a 5 Kg bowling ball with a force of 49 N to a height of 40 m, what is the amount of work done on the
bowling ball to lift it?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 03:30
When a spring is compressed, the energy changes from kinetic to potential. which best describes what is causing this change? work power gravitational energy chemical energy
Answers: 3
question
Physics, 22.06.2019 05:10
Total solidification times of three casting geometries are to be compared: a sphere, a cylinder, in which the length-to-diameter ration - 1.0, and a cube. volume = 1000 cm^3 for all three shhapes, and the same casting alloy is used. a) determine the solidification times of each geometry b) based on the results of part (a), which geometric element would make the best riser? c) if the mold constant = 3.5 min/cm^2 in chvorinov's rule, compute the total solidification time for each casting.
Answers: 3
question
Physics, 22.06.2019 13:40
Consider a double atwood machine constructed as follows: a mass 4m is suspended from a string that passes over a massless pulley on frictionless bearings. the other end of this string supports a second similar pulley, over which passes a second string supporting a mass of 3m at one end and m at the other. using two suitable generalized coordinates, set up the lagrangian and use the lagrange equations to find the acceleration of the mass 4m when the system is released. explain why the top pulley rotates even though it carries equal weights on each side.
Answers: 2
question
Physics, 22.06.2019 16:00
The energy produced as a result of this flow of electrons from atom to atom is called
Answers: 3
You know the right answer?
If you lift a 5 Kg bowling ball with a force of 49 N to a height of 40 m, what is the amount of wor...
Questions
question
Mathematics, 22.06.2019 12:30
question
Mathematics, 22.06.2019 12:30
question
English, 22.06.2019 12:30
Questions on the website: 13722363