subject
Physics, 16.12.2020 16:20 shay5878

Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 750 kW, determine the turbine efficiency and the combined turbineā€“generator efficiency of this plant. Neglect losses in the pipes.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 01:10
The x-coordinate of a particle in curvilinear motion is given by x = 3.1t3 - 4.9t where x is in feet and t is in seconds. the y-component of acceleration in feet per second squared is given by ay = 2.3t. if the particle has y-components y = 0 and vy = 5.0 ft/sec when t = 0, find the magnitudes of the velocity v and acceleration a when t = 1.8 sec. sketch the path for the first 1.8 seconds of motion, and show the velocity and acceleration vectors for t = 1.8 sec. answers: v = ft/sec a = ft/sec2
Answers: 2
question
Physics, 22.06.2019 11:30
Considering only the earth's rotation, determine how much later the asteroid would have had to arrive to put the explosion above helsinki at longitude 25Ėš e? this would have obliterated the city.
Answers: 1
question
Physics, 22.06.2019 12:30
How do the kidneys affect homeostasis
Answers: 1
question
Physics, 22.06.2019 16:40
Panel bc in fig. p2.76 is semi-circular, with the 3 meter radius and horizontal straight edge through point b. compute (a) the hydrostatic force of the water on the panel, (b) its center of pressure, and (c) the moment of this force about point b. assume atmospheric pressure on the dry side of the panel
Answers: 3
You know the right answer?
Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below t...
Questions
Questions on the website: 13722359