subject
Mathematics, 08.02.2022 14:00 cat8339

Direct materials variances Bellingham Company produces a product that requires 2.3 standard pounds per unit. The standard price is $3,40 per pound. 15,900 units used 36,400 pounds, which were purchased at $3.55 per
pound.

What is the direct materials (a) price variance, (b) quantity variance, and (c) cost variance? Round your answers to the nearest dollar. Enter a favorable variance as a negative number using a
minus sign and an unfavorable variance as a positive number.
a. Direct materials price variance
5,460 Unfavorable
b. Direct materials quantity variance
-4,810 X Favorable
c. Direct materials cost variance
Unfavorable
Feedback
Check My Work
Unfavorable variances can be thought of as increasing costs (a debit). Favorable variances can be thought of as decreasing costs (a credit)
Cost variance is the difference between the actual and standard total cost

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
You drop a rubber ball off the roof of a 50 meter high building onto a paved parking lot. it bounces back up with every bounce, but not quite all the way back up to you. after the first bounce it bounces back only 80 percent of the distance it was dropped from. the pattern continues, meaning after every bounce it comes up to just 80 percent of the previous maximum height. so if before the first bounce the height is 50 meters, what height does the ball reach after the fifth bounce? round your answer to one decimal place and chose the correct response from the choices below:
Answers: 1
question
Mathematics, 21.06.2019 21:00
Bo is buying a board game that usually costs bb dollars. the game is on sale, and the price has been reduced by 18\%18%. what could you find the answer?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Cherie works in retail and her weekly salary includes commission for the amount she sells. the equation s=400+0.15c models the relation between her weekly salary, s, in dollars and the amount of her sales, c, in dollars. interpret the slope of the equation.
Answers: 3
question
Mathematics, 22.06.2019 04:00
What value of s iwhat value of s is a solution to this equation? 27+6s=9ss a solution to this equation? 27+6s=9s
Answers: 1
You know the right answer?
Direct materials variances Bellingham Company produces a product that requires 2.3 standard pounds...
Questions
Questions on the website: 13722361