subject
Mathematics, 07.02.2022 08:00 alicia186

A construction crew has just built a new road. They built the road at a rate of 5 kilometers per week. They built 6.25 kilometers of road. How many weeks did it take them?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
What is the maximum total area that 450cm of string can enclose if it is used to form perimeters of two adjoining rectangles as shown?
Answers: 1
question
Mathematics, 21.06.2019 13:30
The blue whale is the largest animal living on the earth. the average blue whale measures 100 feet long (30 meters) and weighs 300,000 pounds (136,000 kilograms). a whale’s head is 1⁄3 of the length of its body. a new baby whale is 1⁄4 the length of a grown whale. the average man is 1⁄17 the length of a blue whale, and 1⁄1,818 its weight. a human baby measures 1⁄4 of the length of an adult. calculate the following information: how long is a whale’s head? how long is a new baby whale? how tall is the average man? how much does the average man weigh? how tall is the average human baby?
Answers: 3
question
Mathematics, 21.06.2019 20:00
What effect would doubling all the dimensions of a triangular pyramid have on the volume of the pyramid? explain your reasoning.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Frank has a devised a formula for his catering business that calculates the number of meatballs he needs to prepare. the formula is m=4a+2c, where c=number of children; m=number of meatballs; a=number of adults. how many meatballs are required for a party of 10 adults and 5 children?
Answers: 1
You know the right answer?
A construction crew has just built a new road. They built the road at a rate of 5 kilometers per wee...
Questions
question
Mathematics, 03.08.2019 19:40
Questions on the website: 13722359