subject
Mathematics, 25.10.2021 22:40 Astudent333

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.730 inches or greater than 0.770 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.04 inches. What is the probability that the manufacturing line will be shut down unnecessarily

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at link to the chart is here
Answers: 1
question
Mathematics, 21.06.2019 18:30
41/17 as a decimal rounded to the nearest hundredth
Answers: 1
question
Mathematics, 21.06.2019 19:00
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be bale to prepare using the sauce?
Answers: 3
question
Mathematics, 22.06.2019 01:30
When you find the area of a triangle do you use in. or in2
Answers: 2
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions
question
Mathematics, 21.03.2020 02:04
question
Mathematics, 21.03.2020 02:04
Questions on the website: 13722361