Mathematics, 25.03.2021 21:40 baller1216
The Loetschberg tunnel was built to connect Bern, Switzerland, with the ski resorts in the southern
Swiss Alps. This was accomplished by the Swiss using one engineering company that started at the
north end and another company that started at the south end. Suppose the company at the north end
could drill the entire tunnel in 22.2 years and south company could do it in 21.8 years. How long would
it have taken the two companies to drill the tunnel?
Answers: 3
Mathematics, 21.06.2019 19:00
Find the length of the diagonal of the rectangle. round your answer to the nearest tenth. || | | 8 m | | | | 11 m
Answers: 2
Mathematics, 22.06.2019 03:30
Explain how you can show five less than a number using algebraic expression
Answers: 1
Mathematics, 22.06.2019 05:30
Shane and abha earned a team badge that required their team to collect no less than 2000 cans for recycling. abha collected 178 more cans than shane did. write an inequality to determine the number of cans, s, that shane could have collected.
Answers: 1
The Loetschberg tunnel was built to connect Bern, Switzerland, with the ski resorts in the southern...
Health, 21.03.2020 01:59
Mathematics, 21.03.2020 01:59
History, 21.03.2020 01:59
History, 21.03.2020 01:59
Computers and Technology, 21.03.2020 01:59
Mathematics, 21.03.2020 01:59
Mathematics, 21.03.2020 01:59