subject
Mathematics, 08.03.2021 20:00 sonyav732

In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minutes was required once a part entered the drill press but before its service could actually begin. When a setup is going on, regard the drill press as being busy. Plot the total number of parts in system as a function of simulated time. As numerical output performance measures, report the total production (number of parts produced), the average and maximum waiting time in queue, the average and maximum total time in system, the time-average and maximum number of parts in queue, and the drill-press utilization. Redo the hand simulation and discuss the results.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Working on itts i’m going to need you to me as i go along 1-5
Answers: 1
question
Mathematics, 21.06.2019 17:00
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Ahiker stands at an unknown elevation before he ascends 2 miles up a mountain to an elevation of 9 miles. find the elevation of the hiker before his ascent.
Answers: 1
question
Mathematics, 21.06.2019 22:20
Which graph has figures that can undergo a similarity transformation to justify that they are similar? (obviously not the third one)
Answers: 2
You know the right answer?
In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minu...
Questions
question
Mathematics, 10.07.2019 04:00
Questions on the website: 13722363