subject
Mathematics, 05.05.2020 23:36 gl648809

A company uses three plants to produce a new computer chip. Plant A produces 30% of the chips. Plant B produces 45% of the chips. The rest of the chips are produced by plant C. Each plant has its own defective rate. These are: plant A g produces 3% defective chips; plant B produces 1% defective chips; plant C produces 5% defective chips. Find the probability that a randomly chosen chip is defective.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Find the equation of the line that goes through the points (4, –1) and (2, –5). use slope formula,equation,to find the slope of a line that passes through the points. m = use slope-intercept form, y = mx + b, to find the y-intercept (b) of the line. b = write the equation in slope-intercept form, y = mx + b.
Answers: 1
question
Mathematics, 21.06.2019 17:30
The length of triangle base is 26. a line, which is parallel to the base divides the triangle into two equal area parts. find the length of the segment between triangle legs.
Answers: 3
question
Mathematics, 21.06.2019 17:50
Eric has challenged himself to walk 24,000 steps in 4 days. if eric walks the same number of steps each day, which function represents the number of steps eric still needs to walk to reach his goal with respect to the number of days since he started his challenge? a. y = 8,000x − 24,000 b. y = -8,000x + 24,000 c. y = 6,000x − 24,000 d. y = -6,000x + 24,000
Answers: 1
question
Mathematics, 21.06.2019 18:00
Clara schumann is buying bagels for her coworkers, she buys a dozen bagels priced at $5.49 a dozen. the bakery's cost for making the bagels is $2.25 per dozen. what is the markup rate based on selling price on a dozen bagels?
Answers: 1
You know the right answer?
A company uses three plants to produce a new computer chip. Plant A produces 30% of the chips. Plant...
Questions
Questions on the website: 13722363