subject
Mathematics, 06.05.2020 07:11 Kennethabrown09

On March 9, Job ACC0002 was completed. The job cost sheet showed a total of $6,000 in direct materials and $8,000 in direct labour at a rate of $20 per direct labour hour. Manufacturing overhead is applied at $30 per direct labour hour. The debit to Finished Goods Inventory to record the completion of Job ACC0002 is

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:40
Which of the following statement about pascal's triangle are true?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Pam buys a sleeve of ball bearings for her skateboard. each of the bearings is 1 1/5 inches wide. the sleeve is 9 3/5 inches long. how many ball bearings are in the sleeve? show your work.
Answers: 3
question
Mathematics, 21.06.2019 19:00
Write a function for a rotation 90 degrees counter clockwise about the origin, point 0
Answers: 1
question
Mathematics, 21.06.2019 21:00
Need match the functions with correct transformation. f(x) = -3x f(x) = |x-1|+3 f(x) = √(x+3) 1/2x² f(x) = (x+1)²-3 4|x| 1. compress by a factor of 1/2 2. stretch by a factor of 4 3. shift to the left 3 4. shift to the left 1 5. shift up 3 6. reflection
Answers: 1
You know the right answer?
On March 9, Job ACC0002 was completed. The job cost sheet showed a total of $6,000 in direct materia...
Questions
question
Spanish, 12.07.2021 15:50
question
Mathematics, 12.07.2021 15:50
question
Spanish, 12.07.2021 16:00
Questions on the website: 13722361