Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:30
An engineer scale model shows a building that is 3 inches tall. if the scale is 1 inch = 600 feet, how tall is the actual building?
Answers: 3
Mathematics, 22.06.2019 01:00
Bc and bd are opposite rays. all of the following are true except a)a,b,c,d are collinear b)a,b,c,d are coplanar c)bc=bd d)b is between c and d
Answers: 1
Mathematics, 22.06.2019 01:00
The measures of the angles in △abc are given by the expressions in the table. angle measure angle a 65° angle b (3x−10)° angle c (2x)∘ find the value of x. then find the m∠b and m∠c.
Answers: 1
63/84 in simplest form...
Mathematics, 03.10.2021 03:20
Mathematics, 03.10.2021 03:20
Geography, 03.10.2021 03:20
Chemistry, 03.10.2021 03:20
Chemistry, 03.10.2021 03:20
Mathematics, 03.10.2021 03:20
Mathematics, 03.10.2021 03:20
Chemistry, 03.10.2021 03:20
Mathematics, 03.10.2021 03:20
English, 03.10.2021 03:30
Mathematics, 03.10.2021 03:30
Computers and Technology, 03.10.2021 03:30