subject
Mathematics, 11.03.2020 05:28 oylermorgan7687

A manufacturing process produces 500 parts per hour. A sample part is selected about every half-hour, and after five parts are obtained, the average of these five measurements is plotted on an X bar control chart.(a) Is this an appropriate sampling scheme if the assignable cause in the process resultsin an instantaneous upward shift in the mean thatt is of very short duration?(b) If your answer is no, propose an alternative procedure.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Which of the angle pairs can be classified as vertical angles? ∠1 and ∠2 ∠2 and ∠4 ∠3 and ∠2 ∠4 and ∠1 ∠3 and ∠1
Answers: 2
question
Mathematics, 21.06.2019 18:30
It says factor each expression 49x-28?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Could somebody me with this radical simplification?
Answers: 1
question
Mathematics, 21.06.2019 20:10
Right triangle xyz has a right angle at vertex y and a hypotenuse that measures 24 cm. angle zxy measures 70ΒΊ. what is the length of line segment xy? round to the nearest tenth. 8.2 cm 8.7 cm 22.6 m 25.5 cm
Answers: 1
You know the right answer?
A manufacturing process produces 500 parts per hour. A sample part is selected about every half-hour...
Questions
question
Mathematics, 07.12.2020 20:00
question
Mathematics, 07.12.2020 20:00
question
Arts, 07.12.2020 20:00
question
Mathematics, 07.12.2020 20:00
question
Mathematics, 07.12.2020 20:00
question
Mathematics, 07.12.2020 20:00
Questions on the website: 13722367