Mathematics, 26.02.2020 03:19 antasia12342
The Electrotech Corporation manufactures two industrialosized electrical devices: generators and atternators- Both ofthese products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1hour of testing and can be sold for a $250 profit Each alternator requires 3 hours of wiring and 2 hours of testing and canbe sold for a $150 profit There are 260 hours of wiring time and 140 hours of testing time available in the next productionperiod, and Electrotech wants to maximize profit. a. Formulate an LP model for this problemb. Sketch the feasible region for this problem. c Determine the optimal solution to this problem using level curves.
Answers: 2
Mathematics, 21.06.2019 18:20
The total cost of anja’s trip to the dentist was $628.35. she paid a flat fee of $89.95 which included the checkup and cleaning and then had 4 cavities filled, each of which cost the same amount. which shows the correct equation and value of x, the cost of each cavity filling?
Answers: 2
Mathematics, 21.06.2019 21:40
Many newspapers carry a certain puzzle in which the reader must unscramble letters to form words. how many ways can the letters of emdangl be arranged? identify the correct unscrambling, then determine the probability of getting that result by randomly selecting one arrangement of the given letters.
Answers: 1
The Electrotech Corporation manufactures two industrialosized electrical devices: generators and att...
Mathematics, 07.07.2019 17:00
English, 07.07.2019 17:00
History, 07.07.2019 17:00
English, 07.07.2019 17:00
Social Studies, 07.07.2019 17:00
English, 07.07.2019 17:00
History, 07.07.2019 17:00
Mathematics, 07.07.2019 17:00
Mathematics, 07.07.2019 17:00
Mathematics, 07.07.2019 17:00
Biology, 07.07.2019 17:00
English, 07.07.2019 17:00
Spanish, 07.07.2019 17:00