subject
Engineering, 07.06.2021 06:00 ghari112345

We need to build up to 6 power plants (L1 to L6) to serve 7 communities (C1 to C7). The cost to build a power plant is 6.5 million (AED). The maximum capacity of each plant is 11 million watts. The demand of each community is given below:

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
You know the right answer?
We need to build up to 6 power plants (L1 to L6) to serve 7 communities (C1 to C7). The cost to buil...
Questions
question
Mathematics, 13.05.2021 18:40
question
Mathematics, 13.05.2021 18:40
question
History, 13.05.2021 18:40
question
Mathematics, 13.05.2021 18:40
question
Mathematics, 13.05.2021 18:40
Questions on the website: 13722362