subject
Engineering, 07.03.2020 04:19 BigGirlsTheBest

For each of the following problems: design a greedy algorithm that solves the problem; describe your algorithm with clear pseudocode; and prove the time efficiency class of your algorithm.

2-coloring input: an undirected graph G (V, E) output: a sequence coloring-((u, c)IE V and ce(1,2) such that each V appears exactly once in colors , and no adjacent vertices are assigned the same color

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at 70Ā°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
For each of the following problems: design a greedy algorithm that solves the problem; describe your...
Questions
question
Mathematics, 20.01.2021 01:00
question
Mathematics, 20.01.2021 01:00
Questions on the website: 13722367