Develop a production schedule to produce the exact production requirements by varying the workforce size for the following problem. The monthly forecasts for Product X for January, February, and March are 1,010, 1,490, and 1,240, respectively. Safety stock policy recommends that half of the forecast for that month be defined as safety stock. There are 22 working days in January, 19 in February, and 21 in March. Beginning inventory is 550 units.
Manufacturing cost is $200 per unit, storage cost is $5 per unit per month, standard pay rate is $8 per hour, overtime rate is $12 per hour, cost of stockout is $10 per unit per month, hiring and training cost is $260 per worker, layoff cost is $360 per worker, and worker productivity is 0.1 unit per hour. Assume that you start off with 42 workers and that they work 8 hours per day. (Leave no cells blank - be certain to enter "0" wherever required. Input all values as positive values. Round Workers Required up to next higher whole number. Round all other variables to nearest whole number.)
January February March
Forecast 1,010 1,490 1,240
Safety stock
Beginning inventory
Net production required
Workers required
Hired
Laid off
Actual production
Ending inventory
January February March
Labor $ $ $
Inventory
Hiring
Layoff
Total $ $ $
Total $

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:30
If temper company, a manufacturer of mattresses, was considering moving its production facilities to china but decided against it because the additional costs of shipping the mattresses back to the u.s. would offset the cost savings associated with moving the production facilities, the increased costs associated with shipping would be an example ofanswers: learning-curve economies.diseconomies of scale.economies of scale.competitive advantages.
Answers: 2
question
Business, 22.06.2019 10:30
Zapper has beginning equity of $257,000, net income of $51,000, dividends of $40,000 and investments by stockholders of $6,000. its ending equity is
Answers: 2
question
Business, 22.06.2019 13:10
Laval produces lamps and home lighting fixtures. its most popular product is a brushed aluminum desk lamp. this lamp is made from components shaped in the fabricating department and assembled in the assembly department. information related to the 22,000 desk lamps produced annually follows.direct materials $280,000direct labor fabricating department (8,000 dlh × $24 per dlh) $192,000assembly department (16,600 dlh × $26 per dlh) $431,600machine hours fabricating department $15,200mhassembly department $20,850mhexpected overhead cost and related data for the two production departments follow.fabricating assemblydirect labor hours 150,000dlh 295,000dlhmachine hours 161,000mh 128,000mhoverhead cost $400,000 430,000required1. determine the plantwide overhead rate for laval using direct labor hours as a base.2. determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead rate.3. compute departmental overhead rates based on machine hours in the fabricating department and direct labor hours in the assembly department.4. use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the aluminum desk lamps.
Answers: 3
question
Business, 22.06.2019 17:40
Within the relevant range, if there is a change in the level of the cost driver, then a. total fixed costs will remain the same and total variable costs will change b. total fixed costs will change and total variable costs will remain the same c. total fixed costs and total variable costs will change d. total fixed costs and total variable costs will remain the same
Answers: 3
You know the right answer?
Develop a production schedule to produce the exact production requirements by varying the workforce...
Questions
question
Mathematics, 25.08.2021 20:30
question
Mathematics, 25.08.2021 20:30
question
History, 25.08.2021 20:30
Questions on the website: 13722362