subject
Business, 11.03.2020 20:15 jtphillips02

Ivan, an industrial engineering student, is working on a homework problem for Engineering Economy. He needs to calculate the PW at 12 percent of a cash fl ow series with $1,000 at t 5 3, $1,500 at t 5 4, and $2,000 at t 5 5. If Ivan uses the equation P 5 1,000(PZA 12%,3) 1 500(PZG 12%,3), where is the P now located?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 01:20
What cylinder head operation is the technician performing in this figure?
Answers: 1
question
Business, 22.06.2019 04:30
Peyton taylor drew a map with scale 1 cm to 10 miles. on his map, the distance between silver city and golden canyon is 3.75 cm. what is the actual distance between silver city and golden canyon?
Answers: 3
question
Business, 22.06.2019 15:20
Kelso electric is debating between a leveraged and an unleveraged capital structure. the all equity capital structure would consist of 40,000 shares of stock. the debt and equity option would consist of 25,000 shares of stock plus $280,000 of debt with an interest rate of 7 percent. what is the break-even level of earnings before interest and taxes between these two options?
Answers: 2
question
Business, 22.06.2019 17:50
Variable rate cd’s = $90 treasury bills = $150 discount loans = $20 treasury notes = $100 fixed rate cds = $160 money market deposit accts. = $140 savings deposits = $90 fed funds borrowing = $40 variable rate mortgage loans $140 demand deposits = $40 primary reserves = $50 fixed rate loans = $210 fed funds lending = $50 equity capital = $120 a. develop a balance sheet from the above data. be sure to divide your balance sheet into rate-sensitive assets and liabilities as we did in class and in the examples. b. perform a standard gap analysis and a duration analysis using the above data if you have a 1.15% decrease in interest rates and an average duration of assets of 5.4 years and an average duration of liabilities of 3.8 years. c. indicate if this bank will remain solvent after the valuation changes. if so, indicate the new level of equity capital after the valuation changes. if not, indicate the amount of the shortage in equity capital.
Answers: 3
You know the right answer?
Ivan, an industrial engineering student, is working on a homework problem for Engineering Economy. H...
Questions
Questions on the website: 13722359