Business, 29.02.2020 04:37 bluepanda21
A project has an original project budget of $1,150 and both the Cost Performance Index (CPI) and Schedule Performance Index (SPI) are equal to 1. Assuming the project will continue to spend money at the same rate, what is the estimate at completion (EAC) of the project
Answers: 3
Business, 22.06.2019 16:10
Answer the following questions using the banker’s algorithm: a. illustrate that the system is in a safe state by demonstrating an order in which the processes may complete. b. if a request from process p1 arrives for (1, 1, 0, 0), can the request be granted immediately? c. if a request from process p
Answers: 1
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
Business, 22.06.2019 19:40
Adistinguishing feature of ecological economics is the concept of cost-benefit analysis steady-state economies that, like natural systems, neither grow nor shrink environmental damage and also environmental benefits are external greenwashing to increase public acceptance of products the only healthy economy is one that is growing
Answers: 1
Business, 23.06.2019 01:10
Match the steps for conducting an informational interview with the task involved in each step or its purpose. 1. research your chosen career field. 2. identify someone to interview. 3. prepare for the interview. 4. conduct the informational interview. 5. follow up with your interviewer. a. learn more about a company that interests you. b. encourage the interviewer to do most of the talking while you take notes. c. write a handwritten -you letter to express that you want to stay in touch. d. make contact through email, a phone call, or mail to arrange the meeting. e. choose a conservative, professional ensemble to wear.
Answers: 3
A project has an original project budget of $1,150 and both the Cost Performance Index (CPI) and Sch...
Biology, 11.03.2020 05:33
Mathematics, 11.03.2020 05:33
Mathematics, 11.03.2020 05:33
Mathematics, 11.03.2020 05:33
Mathematics, 11.03.2020 05:33
English, 11.03.2020 05:33
History, 11.03.2020 05:33
English, 11.03.2020 05:33
Physics, 11.03.2020 05:34