subject
Biology, 20.09.2019 16:30 76022sfox

The cost, c, to produce b baseball bats per day is modeled by the function c(b) = 0.06b2 – 7.2b + 390. what number of bats should be produced to keep costs at a minimum?
27 bats
60 bats
174 bats
390 bats

ansver
Answers: 3

Another question on Biology

question
Biology, 21.06.2019 20:00
What is the best-known carbohydrate?
Answers: 1
question
Biology, 21.06.2019 22:10
What causes the force that pushes magma from the magma chamber through the pipe and vent of a volcano?
Answers: 1
question
Biology, 22.06.2019 06:00
Which example would the nurse consider to be a part of systems thinking theory?
Answers: 1
question
Biology, 22.06.2019 16:10
The source of energy shown in the image is (renewable, non renewable, polluting) a drawback of building a dam is that (it will destroy ecosystems, it requires fossil fuels, it won’t be useful for irrigation)
Answers: 2
You know the right answer?
The cost, c, to produce b baseball bats per day is modeled by the function c(b) = 0.06b2 – 7.2b + 39...
Questions
question
Mathematics, 05.07.2019 03:30
Questions on the website: 13722362