You are in downtown chicago (where streets run n-s and e-w). you started from 600 n. michigan avenue, and walked 3 blocks toward north, 4 blocks toward west, and 1 block toward north to a train station. length of one block is 100 [m]. what is the magnitude and direction of your displacement from the start position?
Answers: 2
Physics, 21.06.2019 18:00
Acommercial passenger jet can travel up to 970 km/hr at an altitude of 30,000 feet. at this speed, how long will it take the jet to travel 1,865 kilometers? a. 2.3 hrs b. 1.9 hrs c. 1.7 hrs d. 1.5 hrs
Answers: 1
Physics, 22.06.2019 10:30
Avery long solenoid of inner radius 2.75 cm creates an oscillating magnetic field of the form = for this solenoid, =0.00425 t and =319 rad/s. (a)what is the maximum value of the induced electric field at a perpendicular distance 1.45 cm from the axis of the solenoid? (b) what is the maximum value of the inducted electric field at a point 5.85 cm perpendicular from the axis of the solenoid?
Answers: 1
Physics, 22.06.2019 11:30
(2) (a) you have a simple circuit that consists of only a battery (δvbat=1.5v) and two resistors with resistance r1=10ω and r2=5ω, connected in series with each other. what is the current running through the battery? (b) you re-arrange your circuit so now r2 is attached in parallel to r1 rather than in series. what is the current running through the battery? (c) you add an additional resistor r3=7ω on the same branch as r2. what is the current running through the battery? (d) what is the power dissipated in r3?
Answers: 3
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You are in downtown chicago (where streets run n-s and e-w). you started from 600 n. michigan avenue...
History, 27.04.2020 03:08
English, 27.04.2020 03:08
Mathematics, 27.04.2020 03:08
Physics, 27.04.2020 03:08
Mathematics, 27.04.2020 03:08
Advanced Placement (AP), 27.04.2020 03:08
History, 27.04.2020 03:08
Social Studies, 27.04.2020 03:08
Mathematics, 27.04.2020 03:08
Mathematics, 27.04.2020 03:09
Biology, 27.04.2020 03:09