subject
Social Studies, 07.10.2019 18:00 toddbecca9

Hydraulic engineers in the united states often use, as a unit of volume of water, the acre-foot, defined as the volume of water that will cover 1 acre of land to a depth of 1 ft. a severe thunderstorm dumped 2.0 in. of rain in 30 min on a town of area 26 km2.what volume of water, in acre-feet, fell on the town?

ansver
Answers: 2

Another question on Social Studies

question
Social Studies, 22.06.2019 01:00
What is the natural environment? the story of the interaction of people forming societies, cultures, and civilizationsan increase in the world’s temperaturethe process by which social institutions are adopted on a global scalethe natural world in which people, plants, and animals live
Answers: 1
question
Social Studies, 22.06.2019 09:10
In griswold v. connecticut, on what did justice goldberg base his concurring opinion? the protection granted by the constitution the intention of the writers of the constitution the list of rights in the first eight amendments the human rights safe from government intervention
Answers: 1
question
Social Studies, 22.06.2019 10:00
Aresearcher conducting behavioral research collects individually identifiable sensitive information about illicit drug use and other illegal behaviors by surveying college students. the data are stored on a laptop computer without encryption, and the laptop computer is stolen from the researcher’s car on the way home from work. this is an unanticipated problem that must be reported because the incident was (a) unexpected (i.e., the researchers did not anticipate the theft); (b) related to participation in the research; and (c) placed the subjects at a greater risk of psychological and social harm from the breach in confidentiality of the study data than was previously known or recognized. according to ohrp, this unanticipated problem must be reported to the irb in which timeframe? promptlywithin 48 hourswithin 24 hourswithin two weeks
Answers: 2
question
Social Studies, 22.06.2019 12:00
Abrief, "first-step" presentation of a work to be completed is called a
Answers: 1
You know the right answer?
Hydraulic engineers in the united states often use, as a unit of volume of water, the acre-foot, def...
Questions
question
Mathematics, 20.08.2019 02:10
question
Mathematics, 20.08.2019 02:10
question
English, 20.08.2019 02:10
Questions on the website: 13722367