subject
Physics, 22.07.2019 06:00 bigboi97

The diagram shows light passing through and opening and forming bonds. which two order bands are the dimmest? a. n=0 and n=1 b. n=0 and n=3 c. n=1 and n=2 d. n=2 and n=3

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 16:00
As shown in fig. p3.64, a closed, rigid tank fitted with a fine-wire electric resistor is filled with refrigerant 22, initially at 2108c, a quality of 80%, and a volume of 0.01 m3. a 12-volt battery provides a 5-amp current to the resistor for 5 minutes. if the final temperature of the refrigerant is 408c, determine the heat transfer, in kj, from the refrigerant.
Answers: 1
question
Physics, 22.06.2019 02:00
An object has a weight of 500 on earth what is the mass of this object
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 19:20
Aproduction line at v. j. sugumaran's machine shop has three stations. the first station can process a unit in 7 minutes. the second station has two identical machines, each of which can process a unit in 16 minutes (each unit only needs to be processed on one of the two machines). the third station can process a unit in 10 minutes. โ–ผ is the bottleneck station, with a bottleneck time of nothing minutes per unit (enter your response as a whole number).
Answers: 3
You know the right answer?
The diagram shows light passing through and opening and forming bonds. which two order bands are the...
Questions
question
History, 19.09.2019 06:10
question
Mathematics, 19.09.2019 06:10
question
Biology, 19.09.2019 06:10
Questions on the website: 13722360