subject
Physics, 04.08.2019 16:30 graymonky12

Which of the following statements about stars is true? a. stars rarely differ in temperature b. stars vary greatly in temperature c. all stars are the same temperature d. none of these

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:50
How does the image distance (di) of a convex lens compare with the image distance of a concave lens? a. the image distance of the convex lens is positive, and that of the concave lens is negative. b. both are negative for a virtual image. c. both are positive for a virtual image d. the image distance of the convex lens is negative, and that of the concave lens is positive.
Answers: 1
question
Physics, 21.06.2019 22:50
Acar of mass m goes around a banked curve of radius r with speed v. if the road is frictionless due to ice, the car can still negotiate the curve if the horizontal component of the normal force on the car from the road is equal in magnitude to 101) a) mv2/r b) mg/2. d) mg e) tan[v2/(eg)]
Answers: 2
question
Physics, 22.06.2019 05:10
What is the electric force acting between two charges of -0.0045 c and -0.0025 c that are 0.0060 m apart? use fe=kq1q2/r^2 and k = 9.00 x 10^9 n*m^2/c^2 a. 1.7 x 10^7 n b. -1.7 x 10^7 n c. -2.8 x 10^9 n d. 2.8 x 10^9 n
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
Which of the following statements about stars is true? a. stars rarely differ in temperature b. sta...
Questions
question
Business, 23.11.2019 13:31
question
Mathematics, 23.11.2019 13:31
question
History, 23.11.2019 13:31
question
Social Studies, 23.11.2019 13:31
Questions on the website: 13722360