subject
Physics, 20.05.2021 09:50 Mordred9571

A breass of length 50cm increase to 56cm when heated from 50°c to 60°c calculate it's linear expansivity​

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 00:10
The energy released by a chemical reaction can be measured using a calorimeter. when barium hydroxide octahydrate crystals are reacted with dry ammonium chloride inside of a coffee cup calorimeter, the temperature of the 18.00 g of water in the calorimeter decreases from 30.0°c to 8.0°c. the equation for calculating energy absorbed or released by a reaction is: where q is the energy released or absorbed, m is the mass of water in the calorimeter, cp is the specific heat of water, and δt is the observed temperature change. if the specific heat of liquid water is 4.19 j/g·°c, how much energy was absorbed by the reaction?
Answers: 3
question
Physics, 22.06.2019 00:30
Aball tossed vertically upward from the ground next to a building passes the bottom of a window 1.8 s after being tossed and passes the top of the window 0.20 s later. the window is 2.0 m high from top to bottom. what was the ball's initial velocity? the unit vector j^ is directed upward. how far is the bottom of the window from the launch position? how high does the ball rise above the launch position?
Answers: 1
question
Physics, 22.06.2019 09:30
Why are graphs useful when interpreting data
Answers: 2
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
A breass of length 50cm increase to 56cm when heated from 50°c to 60°c calculate it's linear expansi...
Questions
question
History, 12.04.2020 07:11
question
Mathematics, 12.04.2020 07:12
question
Mathematics, 12.04.2020 07:12
question
Mathematics, 12.04.2020 07:13
Questions on the website: 13722363