Answers: 1
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Physics, 23.06.2019 04:40
Abody covers a semicircle of radius 7cm in 5s .find its linear speed
Answers: 1
Physics, 23.06.2019 11:00
The temperature of a solution can change the solubility of a substance. the chart shows the solubility of the same solute at different temperatures in water. based on the chart, which solution was at the optimal temperature to allow for the greatest solubility? w x y z
Answers: 2
I think i should leave wht shld i do?...
Computers and Technology, 16.04.2021 05:50
English, 16.04.2021 05:50
Mathematics, 16.04.2021 05:50
Mathematics, 16.04.2021 05:50
Social Studies, 16.04.2021 05:50
French, 16.04.2021 05:50
Mathematics, 16.04.2021 05:50
Physics, 16.04.2021 05:50
Computers and Technology, 16.04.2021 05:50
Mathematics, 16.04.2021 05:50
Physics, 16.04.2021 05:50