subject
Physics, 26.04.2021 23:50 dasan21

A block and tackle of 6 pulleys is used to raise a load of 300 newton steadily through a height of 30 meters. If the work done against friction is 2000j calculate the work done by effort?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 16:30
Matt is driving down 7th street. he drives 150 meters in 18 seconds. assuming he does not speed up or slow down, what is his speed?
Answers: 2
question
Physics, 22.06.2019 08:20
The two required components for a generator
Answers: 2
question
Physics, 22.06.2019 20:00
Positive ions differ from neutral atoms in that
Answers: 3
question
Physics, 22.06.2019 21:30
What ia the energy of an object because of its potential and kinetic energies
Answers: 1
You know the right answer?
A block and tackle of 6 pulleys is used to raise a load of 300 newton steadily through a height of 3...
Questions
question
English, 07.11.2019 06:31
Questions on the website: 13722361