Answers: 2
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
Physics, 23.06.2019 02:00
Estimate the kinetic energy of mars with respect to the sun as the sum of two terms, that due to its daily rotation about its axis, and that due to its yearly revolution about the sun. (assume mars is a uniform sphere with mass = 6.4×10 to the power of 23 kg, radius = 3.4×10 to the power of 6 m, rotation period = 24.7 hours, orbital period = 686 days and is 2.3×10 to the power of 8 km from the sun.)
Answers: 2
Physics, 23.06.2019 06:50
Un conductor circula por una carretera en una velocidad de 90 km/h y b que se enciende la luz amarilla de un semáforo situado una distancia de 150 m. si el semáforo tarda tres segundos en cambiar a rojo el coche frena con una aceleración de 2 m por segundos 2¿ cometer una infracción ese conductor?
Answers: 1
The work per unit charge required to move a charge between two points in an electric circuit defines...
Mathematics, 18.03.2021 16:50
Physics, 18.03.2021 16:50
English, 18.03.2021 16:50
Mathematics, 18.03.2021 16:50
Mathematics, 18.03.2021 16:50
History, 18.03.2021 16:50
English, 18.03.2021 16:50
Mathematics, 18.03.2021 16:50
Mathematics, 18.03.2021 16:50