subject
Physics, 02.03.2021 04:10 mmassaro19

Please do the attachment. I will give brainlest I promise to the right answer and also will give extra points to that person. DUE IN 5 MINUTES


Please do the attachment. I will give brainlest I promise to the right answer and also will give ex

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 22:00
Orque can be calculated by multiplying the force (n) applied at 90? to the lever arm at a distance (m) from the pivot point (point of rotation), the compound si unit for the torque is n? m. if the force (at 90? to the lever arm) applied is 15 n and it is applied at 2.0 m from the pivot point (point of rotation), what is the torque on the lever?
Answers: 3
question
Physics, 22.06.2019 06:40
Light traveling in a medium with a refractive index 1.19 is incident on a plate of another medium with index of refraction 1.79. at what angle of incidence is the reflected light fully polarized?
Answers: 2
question
Physics, 22.06.2019 07:50
2. -/1 pointsserpse10 2.7.p.017.mi. an object moving with uniform acceleration has a velocity of 14.0 cm/s in the positive x direction when its x coordinate is 2.97 cm. if its x coordinate 2.85 s later is -5.00 cm, what is its acceleration? cm/s2 need ? read it master it
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
Please do the attachment. I will give brainlest I promise to the right answer and also will give ext...
Questions
question
Biology, 04.03.2021 19:20
question
Social Studies, 04.03.2021 19:20
question
Mathematics, 04.03.2021 19:20
question
Chemistry, 04.03.2021 19:20
Questions on the website: 13722367