subject
Physics, 01.09.2019 21:30 hjenn31

Josh and jake are both to build a brick wall which is 6 meters in height. they each lay 250 bricks, but josh finishes this task in 3 hours while jake requires 4.5 hours to complete his part. who does more work, or do they both do the same amount? who has more power? explain.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 03:00
Which of the following is not a part of the respiratory system? a. pharynx b. trachea c. pancreas d. larynx
Answers: 1
question
Physics, 22.06.2019 04:30
In a voltaic cell, electrons flow from the (positive/negative) to the (positive/negative) terminal.
Answers: 1
question
Physics, 22.06.2019 05:20
A3.9 g aluminum foil ball with a charge of +4.1Ɨ10āˆ’9 c is suspended on a string in a uniform horizontal eāƒ— field. the string deviates to the right and makes an angle of 30āˆ˜ with the vertical. part a part complete what information about the eāƒ— field can you determine for this situation? what information about the field can you determine for this situation? only the magnitude of eāƒ— only the direction of eāƒ— both the magnitude and the direction of eāƒ— none of the above previous answers correct part b determine the magnitude of the electric field. express your answer with the appropriate units. e e = nothing nothing request answer part c determine the direction of the electric field. determine the direction of the electric field. to the right to the left away from you toward you
Answers: 3
question
Physics, 22.06.2019 07:00
The cerebellum controls? thirst sensations sleep-wake cycles hand-eye coordination heart rate and pulse
Answers: 1
You know the right answer?
Josh and jake are both to build a brick wall which is 6 meters in height. they each lay 250 bricks,...
Questions
question
Mathematics, 20.11.2020 23:00
question
Mathematics, 20.11.2020 23:00
question
Mathematics, 20.11.2020 23:00
Questions on the website: 13722367