subject
Physics, 21.01.2021 06:50 angie249

A car that is initially moving to the left with a velocity of -5 m/s is pushed by a -10 N force as it moves from 25 meters to 5 meters. How much work is done to the car by this force?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 10:00
Which subatomic particle has a negative charge
Answers: 2
question
Physics, 22.06.2019 11:00
Looking at this barometer, is the air pressure high or low? what type of weather would you expect? high, bad low, bad high, good low, good
Answers: 1
question
Physics, 22.06.2019 23:20
Consider a production line with five stations. station 1 can produce a unit in 9 minutes. station 2 can produce a unit in 10 minutes. station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. station 4 can produce a unit in 5 minutes. station 5 can produce a unit in 8 minutes. which station is the bottleneck station?
Answers: 2
question
Physics, 23.06.2019 02:10
What is the quantity which is measured by the area occupied below the velocity- time graph?
Answers: 2
You know the right answer?
A car that is initially moving to the left with a velocity of -5 m/s is pushed by a -10 N force as i...
Questions
question
Mathematics, 13.09.2019 21:20
question
Biology, 13.09.2019 21:20
Questions on the website: 13722363