subject
Physics, 04.01.2021 23:50 kyleereeves2007

Vertical Motion Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingles from the
top of the roof located 4.50 m above the ground. Determine the time
required for the shingles to reach the ground. / Luke está trabajando en
arreglar un techo. Deja caer una pila de tejas desde la parte superior del
techo ubicado a 4.50 m sobre el suelo. Determina el tiempo necesario para
que las tejas lleguen al suelo.
Formula:
Given Variables:
V,=
V =
I
t =
a =
X =
Rearrange:
Unknown:
Substitute & Solve:


Vertical Motion

Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingles fr

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 10:30
What are two different ways you could find the value of a? explain these methods.
Answers: 2
question
Physics, 22.06.2019 12:30
What is the power rating of the lightbulb if 3.0 a flow through it when connected to a 15 v battery
Answers: 1
question
Physics, 22.06.2019 21:20
The strong nuclear force acts over a small distance than the electrostatic force. true or false
Answers: 2
question
Physics, 23.06.2019 01:30
In general what determines whether atoms will form chemical bonds?
Answers: 2
You know the right answer?
Vertical Motion Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingle...
Questions
question
History, 20.02.2020 22:30
Questions on the website: 13722367