subject
Physics, 16.11.2020 04:30 marjorieheckaman

Calculate the work done by applying a 125 N force to the right on a 65.0 kg sled to displace the sled 3.50 m right

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 06:40
How does the kinetic energy of a charge change as the charge moves under the effect of an electric field from higher potential to lower potential? a.the kinetic energy increases.b.the kinetic energy decreases.c.the kinetic energy remains the same.d.the kinetic energy is always zero.
Answers: 1
question
Physics, 22.06.2019 07:00
Critical mass is the of material required to produce a chain reaction. a.) minimum amount b.) atomic mass c.) precise amount d.) maximum amount
Answers: 1
question
Physics, 23.06.2019 06:00
If we decrease the amount of force and keep all other factors the same what will happen to the amount of work
Answers: 1
question
Physics, 23.06.2019 07:10
Atoy airplane, flying in a horizontal, circularpath, completes 10. complete circles in 30.seconds. if the radius of the plane’s circular pathis 4.0 meters, the average speed of the airplane is(1) 0.13 m/s (3) 1.3 m/s(2) 0.84 m/s (4) 8.4 m/s
Answers: 3
You know the right answer?
Calculate the work done by applying a 125 N force to the right on a 65.0 kg sled to displace the sl...
Questions
question
Mathematics, 10.03.2020 00:25
Questions on the website: 13722367