subject
Physics, 12.11.2020 20:10 makenziehook8

The diagram above shows a load that will be lifted using a lever. The distance from the tip of the fulcrum to the end of the board carrying the load is 5 m. The entire length of the board is 15 m. The end of the board where force will be applied is 3 m off the ground. How much work will be done if the load is raised as high as the lever can raise it, and the force used is 500 N? A. 497 N·m B. 1,500 N·m C. 167 N·m D. 3 N·m


The diagram above shows a load that will be lifted using a lever. The distance from the tip of the

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 22:30
If a sphere and a cure have the same mass and are propelled up a ramp with the same force, which would travel father up the ramp? explain.
Answers: 1
question
Physics, 22.06.2019 01:30
Ablock of mass 1.5 kg slides down an inclined plane that has an angle of 15. if the inclined plane has no friction and the block starts at a height of 3 m, how much kinetic energy does the block have when it reaches the bottom? acceleration due to gravity is g = 9.8 m/s2. a. 6.8 j b. 50.9 j c. 0 j d. 44.1 j
Answers: 1
question
Physics, 22.06.2019 06:30
Which one of the following research methods can show cause and effect
Answers: 1
question
Physics, 22.06.2019 13:00
Aplayground merry-go-round has a radius of 4.6 m and a moment of inertia of 200 kg-m2 and turns with negligible friction about a vertical axle through its center. a child applies a 26.0 n force tangentially to the edge of the merry-go-round for 15.0 seconds. if the merry-go-round is initially at rest, how much work did the child do on the merry-go-round?
Answers: 1
You know the right answer?
The diagram above shows a load that will be lifted using a lever. The distance from the tip of the f...
Questions
Questions on the website: 13722361