subject
Physics, 06.11.2020 23:10 natb7828

A 3.00 kg object is lifted from the floor and placed on a shelf that is 2.50 m above the floor. What was the work done in lifting the object?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 19:30
11. you want to calculate the displacement of an object thrown over a bridge. using -10 m/s2 for acceleration due to gravity, what would be the total displacement of the object if it took 8 seconds before hitting the water?
Answers: 1
question
Physics, 22.06.2019 02:30
Awave travels at a speed of 5.2 m/s. if the distance between crests is 0.40 m, what is the frequency of the wave? use f=v/wavelength a. 13 hz b. 2.1 hz c. 0.077 hz d. 5.6 hz
Answers: 1
question
Physics, 22.06.2019 07:20
Use the information presented in the graph to answer the questions. which segments show acceleration? which segment indicates that the object is slowing down? what is the velocity of segment b? what is the acceleration of segment b?
Answers: 3
question
Physics, 22.06.2019 07:20
Diamond will scratch quartz. true or false
Answers: 2
You know the right answer?
A 3.00 kg object is lifted from the floor and placed on a shelf that is 2.50 m above the floor. Wha...
Questions
Questions on the website: 13722367