subject
Physics, 24.10.2020 01:00 aidy8665

Question: 5 of 10 >
Save & Exit
Two ropes are tied to a steel ring, and a student holds the free end of each rope. The students then pull on the ropes in a tug-of-war. If the forces exerted by the students are unbalanced, what happens to the ring?

A. The ring remains at rest.
B. The ring moves at a constant velocity.
C. The ring accelerates in the direction of the net unbalanced force.
D. The ring accelerates in the direction opposite the net unbalanced force.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 13:20
This energy transformation diagram represents the energy of a skateboarder moving along a half-pipe. as she skates toward the top of the half-pipe, her original kinetic energy is converted to potential energy and friction. how much of the energy is potential?
Answers: 3
question
Physics, 22.06.2019 13:40
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
question
Physics, 22.06.2019 17:30
This chart shows characteristics of three different types of waves. which statement is best supported by the information in the chart? wave x and wave y are mechanical waves, and wave z is an electromagnetic wave. wave x and wave y are electromagnetic waves, and wave z is a mechanical wave. wave x and wave z are electromagnetic waves, and wave y is a mechanical wave. wave x and wave z are mechanical waves, and wave y is an electromagnetic wave.
Answers: 1
question
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
You know the right answer?
Question: 5 of 10 >
Save & Exit
Two ropes are tied to a steel ring, and a studen...
Questions
question
Mathematics, 29.09.2021 17:10
question
Mathematics, 29.09.2021 17:10
question
Mathematics, 29.09.2021 17:10
question
Computers and Technology, 29.09.2021 17:10
question
Mathematics, 29.09.2021 17:10
question
Mathematics, 29.09.2021 17:10
Questions on the website: 13722363