subject
Physics, 20.09.2020 18:01 lilbloke

An engineering team has a goal of installing new, more efficient solar panels on the International Space Station. Which equation best describes a cost-benefit analysis the
team might perform?
A. Improved efficiency - manufacturing expenses - fuel to reach orbit = net
benefit
B. Improved efficiency + manufacturing expenses + fuel to reach orbit = net
benefit
C. Improved efficiency - manufacturing expenses + fuel to reach orbit = net
benefit
D. Improved efficiency + manufacturing expenses - fuel to reach orbit = net
benefit

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 14:30
Foreshadowing. the prologue states that this is the story of "star-crossed lovers." there are four strong foreshadowings of evil in act 1. identify at least two foreshadowings and explain their purpose.
Answers: 1
question
Physics, 22.06.2019 10:00
Which fact supports the conclusion that there will be fewer farm managers in the future? a) a farmer manager’s duties vary by the type of farm. b) farm technology is replacing some administrative jobs c) farm managers often need experience but not education. d) administrative duties include budgeting and training staff.
Answers: 2
question
Physics, 22.06.2019 10:30
Carbon is allowed to diffuse through a steel plate 15 mm thick. the concentrations of carbon at the two faces are 0.65 and 0.30 kg c/m^3 fe, which are maintained constant. if the preexponential and activation energy are 6.2 x 10-7 m2 /s and 80,000 j/mol, respectively, compute the temperature at which the diffusion flux is 1.43 x 10^-9 kg/m^2 -s.
Answers: 3
question
Physics, 22.06.2019 11:30
If the chemical properties of a substance remain unchanged and appearance or shape of a substance changes it is called a ?
Answers: 1
You know the right answer?
An engineering team has a goal of installing new, more efficient solar panels on the International...
Questions
question
Mathematics, 10.07.2019 22:30
Questions on the website: 13722360