subject
Physics, 01.09.2020 18:01 acrespo3425

A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with uniform acceleration. When the bricks are 5m from the ground, they have a speed of 5m/s.
How much work is done during this process?
A) 2.5kJ
B) 10kJ
C) 12.5kJ
D) 35kJ

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 19:30
Aparticle travels in a circular orbit of radius 21 m. its speed is changing at a rate of 23.1 m/s2 at an instant when its speed is 37.2 m/s. what is the magnitude of the acceleration (in m/s? ) of the particle?
Answers: 1
question
Physics, 22.06.2019 03:00
Which boundary is associated with the building of the himalaya mountains? convergent transform divergent hot spot
Answers: 1
question
Physics, 22.06.2019 10:30
Avery long solenoid of inner radius 2.75 cm creates an oscillating magnetic field of the form = for this solenoid, =0.00425 t and =319 rad/s. (a)what is the maximum value of the induced electric field at a perpendicular distance 1.45 cm from the axis of the solenoid? (b) what is the maximum value of the inducted electric field at a point 5.85 cm perpendicular from the axis of the solenoid?
Answers: 1
question
Physics, 22.06.2019 11:20
More solar radiation is absorbed by earth’s surface than by
Answers: 1
You know the right answer?
A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with u...
Questions
question
Social Studies, 28.08.2019 21:30
question
Health, 28.08.2019 21:30
question
Social Studies, 28.08.2019 21:30
Questions on the website: 13722362