subject
Physics, 14.04.2020 22:19 RebelZane18

A 5 kg bucket is lifted from the ground into the air by pulling in 10 meters of rope with linear density of 2 kg/m at a constant speed. The bucket starts with 100 cm^3 of water and leaks at a constant rate. It finishes draining just as it reaches the 10 meter mark. How much work was spent lifting the bucket, rope, and water?

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 20:30
Aball is thrown straight up into the air with a speed of 21 m/s. if the ball has a mass of 0.1 kg, how high does the ball go? acceleration due to gravity is g = 9.8 m/s^2. a. 22.5 m b. 20.0 m c. 25.0 m d. 17.5 m
Answers: 2
question
Physics, 21.06.2019 22:20
1400 kg car has a speed of 27 m/s. if it takes 7 s to stop the car, what is the impulse and the average force acting on the car?
Answers: 1
question
Physics, 22.06.2019 07:00
Examine the equation. 23490th→23088ra+42he what kind of barrier would you need to block the radioactive particles from this reaction? a.a piece of paper b.a sheet of aluminum foil c. a two-inch block of lead d. a solid concrete block
Answers: 1
question
Physics, 22.06.2019 18:30
Two trains leave a station at the same time, train a travels at a constant speed of 16 m/s. train b starts at 8.0 m/s but accelerates constantly at 1.0 m/s squared. after 10.0 seconds, which train has the greater speed?
Answers: 1
You know the right answer?
A 5 kg bucket is lifted from the ground into the air by pulling in 10 meters of rope with linear den...
Questions
Questions on the website: 13722362