subject
Physics, 04.04.2020 07:32 misstaejailicious200

If a box is on a flat, horizontal sidewalk and a force (F) acts on a box for 2 m doing 20 J of work on the box and a frictional force act on the box for the same 2 m and does 15 J of work on the box. What is the total work done on the box and what is the box doing at the end of the 2 m

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 06:20
Oxygen undergoes an isentropic expansion from 120 degree c and 280 kpa absolute to 140 kpa absolute. determine the final temperature of the oxygen and the amount of work per kg of o_2 produced in the process if it is adiabatic.
Answers: 1
question
Physics, 22.06.2019 09:00
When a light bulb shines, it gives off light energy and energy. a. heat b. potential c. chemical d. electrical
Answers: 2
question
Physics, 22.06.2019 12:00
The mass of a bowling ball is 10 kg and the mass of a ping pong ball is 0.015 kg. if the two objects are 5 meters apart, what is the gravitational force ?
Answers: 1
question
Physics, 22.06.2019 12:40
Estimate the schwarzschild radius (in kilometers) for a mini-black hole formed when a superadvanced civilization decides to punish you (unfairly) by squeezing you until you become so small that you disappear inside your own event horizon. (assume that the your weight is 50 kg)
Answers: 1
You know the right answer?
If a box is on a flat, horizontal sidewalk and a force (F) acts on a box for 2 m doing 20 J of work...
Questions
question
English, 13.04.2021 23:30
question
Biology, 13.04.2021 23:30
Questions on the website: 13722367