In a shipping yard, a crane operator attaches a cable to a 1240-kg shipping container and then uses the crane to lift the container vertically at a constant velocity for a distance of 37 m. Determine the amount of work done by each of the following.

(a) the tension in the cable
(b) the force of gravity

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 06:30
2kg of refrigerant 134a undergoes a polytropic process in a piston-cylinder assembly from an initial state of saturated vapor at 2 bar to a final state of 12 bar, 80 degree c. a)determine the work for the process in kj. b)sketch the process on a p-v diagram.
Answers: 2
question
Physics, 22.06.2019 13:50
Most of the volume of an atom is occupied by the
Answers: 1
question
Physics, 22.06.2019 17:40
A15.75-g piece of iron absorbs 1086.75 joules of heat energy, and its temperature changes from 25°c to 175°c. what is the specific heat capacity of iron?
Answers: 1
question
Physics, 22.06.2019 18:30
If a star is moving toward earth, it is
Answers: 2
You know the right answer?
In a shipping yard, a crane operator attaches a cable to a 1240-kg shipping container and then uses...
Questions
question
History, 15.07.2019 19:20
Questions on the website: 13722367