subject
Physics, 12.03.2020 07:40 MrSavannahCat

Find the work done in moving an object along a vector r=3i+2j−5k if the applied force is f=2i-j-k

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 11:30
Where is the potential energy throughout the loading, cocking, and releasing of the trebuchet?
Answers: 2
question
Physics, 22.06.2019 16:30
An astronaut in space cannot use a scale or balance to weigh objects because there is no gravity. but she does have devices to measure distance and time accurately. she knows her own mass is 77.4 kg , but she is unsure of the mass of a large gas canister in the airless rocket. when this canister is approaching her at 3.50 m/s , she pushes against it, which slows it down to 1.30 m/s (but does not reverse it) and gives her a speed of 2.60 m/s . what is the mass of the canister?
Answers: 1
question
Physics, 22.06.2019 16:30
One number is said to be an "order of magnitude" larger than another number if choose one: a. it is 10 times larger. b. it is 5 times larger. c. it is 3 times larger. d. it is 100 times larger. e. it is 2 times larger.
Answers: 1
question
Physics, 22.06.2019 18:00
Athin nonconducting rod with a uniform distribution of positive charge q is bent into a circle of radius r. the central perpendicular axis through the ring is a z-axis, with the origin at the center of the ring. a) what is the magnitude of the electric field due to the rod at z = 0? n/c (b) what is the magnitude of the electric field due to the rod at z = infinity? n/c (c) in terms of r, at what positive value of z is that magnitude maximum? r (d) if r = 4.00 cm and q = 9.00 µc, what is the maximum magnitude? n/c
Answers: 1
You know the right answer?
Find the work done in moving an object along a vector r=3i+2j−5k if the applied force is f=2i-j-k...
Questions
question
Mathematics, 13.10.2020 03:01
question
Mathematics, 13.10.2020 03:01
Questions on the website: 13722367