subject
Physics, 25.02.2020 04:34 roorootx

An ambulance has been dispatched to an emergency scene that is 7 miles away. If the ambulance averages 35 miles per hour, how long will it take the ambulance to reach the scene?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:30
Around faucet handle is part of a(n) a. lever b. screw c. inclined plane d. wheel and axle
Answers: 1
question
Physics, 22.06.2019 00:50
While goofing off at the ice skating rink, a student takes off her shoes and places each of them on the ice. her friend, a hockey player, then shoots a hockey puck at each shoe. the first puck immediately comes to rest after it collides with the left shoe. the second puck rebounds after it collides with the right shoe. if each hockey puck has the same incoming speed, which shoe has greater speed after the collision? the right shoe. both shoes have the same speed. the left shoe.
Answers: 3
question
Physics, 22.06.2019 15:30
To understand the electric potential and electric field of a point charge in three dimensions consider a positive point charge q, located at the origin of three-dimensional space. throughout this problem, use k in place of 14? ? 0. part adue to symmetry, the electric field of a point charge at the origin must point from the origin.answer in one word.part bfind e(r), the magnitude of the electric field at distance r from the point charge q.express your answer in terms of r, k, and q. part cfind v(r), the electric potential at distance rfrom the point charge q.express your answer in terms of r, k, and q part dwhich of the following is the correct relationship between the magnitude of a radial electric field and its associated electric potential ? more than one answer may be correct for the particular case of a point charge at the origin, but you should choose the correct general relationship. a)e(r)=dv(r)drb)e(r)=v(r)rc)e(r)=? dv(r)drd)e(r)=? v(r)r
Answers: 2
question
Physics, 22.06.2019 23:20
Consider a production line with five stations. station 1 can produce a unit in 9 minutes. station 2 can produce a unit in 10 minutes. station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. station 4 can produce a unit in 5 minutes. station 5 can produce a unit in 8 minutes. which station is the bottleneck station?
Answers: 2
You know the right answer?
An ambulance has been dispatched to an emergency scene that is 7 miles away. If the ambulance averag...
Questions
question
Mathematics, 15.02.2021 21:10
question
Mathematics, 15.02.2021 21:10
Questions on the website: 13722363