A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 22:00
Bernie drove home from a vacation in 1.5 hours. he traveled a total distance of 60 miles. what was his average speed in miles per hour? a. 60 mph b. 90 mph c. 40 mph d. 55mph
Answers: 1
question
Physics, 22.06.2019 09:40
When you jump from an elevated position you usually bend your knees upon reaching the ground. by doing this, you make the time of the impact about 10 times as great as for a stiff-legged landing. in this way the average force your body experiences is a) less than 1/10 as great. b) more than 1/10 as great. c) about 1/10 as great.d) about 10 times as great.
Answers: 1
question
Physics, 22.06.2019 16:30
In a hydrogen molecule there are a total of four charges, 2 protons in the two nuclei, and 2 electrons. how many unique charge-pairs are there (without double counting)?
Answers: 3
question
Physics, 23.06.2019 10:30
How long will a plane have to fly continuously with 1100 miles per hour in order to cover the same distance as that from earth to the next star, proxima centauri?
Answers: 2
You know the right answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...
Questions
question
Chemistry, 24.07.2019 07:30
question
Mathematics, 24.07.2019 07:30
Questions on the website: 13722359