subject
Physics, 21.02.2020 05:03 clarissajimenez27

A 5000-lb wrecking ball hangs from a 30-ft cable of density 7 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 30 ft in the air by drawing in the cable.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 12:20
Which of the following situations is impossible? a) an object has velocity directed east and acceleration directed east. b) an object has zero velocity but non-zero acceleration. c) an object has constant non-zero velocity and changing acceleration. d) an object has velocity directed east and acceleration directed west. e) an object has constant non-zero acceleration and changing velocity.
Answers: 2
question
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
question
Physics, 22.06.2019 23:30
How is the ideal mechanical advantage of a wheel and axle calculated?
Answers: 1
You know the right answer?
A 5000-lb wrecking ball hangs from a 30-ft cable of density 7 lb/ft attached to a crane. Calculate t...
Questions
question
Mathematics, 13.12.2020 23:30
question
English, 13.12.2020 23:40
question
Mathematics, 13.12.2020 23:40
question
Social Studies, 13.12.2020 23:40
question
English, 13.12.2020 23:40
question
Mathematics, 13.12.2020 23:40
Questions on the website: 13722367