subject
Physics, 14.02.2020 03:27 diamondscott9297

An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h. If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 17:00
What would the difference of spectral lines emitted by hydrogen gas in distant galaxies which is normally found at a wavelength of 21 cm on earth, be observed at 21.1 centimeters?
Answers: 2
question
Physics, 22.06.2019 14:30
Which of the following bonds would be most polar? a. c-i b. c-br c. c-cl d. c-f e. c-o
Answers: 1
question
Physics, 22.06.2019 20:40
Newtons view of arrangement of the universe. don't copy from anywhere.
Answers: 3
question
Physics, 23.06.2019 15:00
Isaac walks 4 blocks north. then he turns he turns around and walks 1 block south. which of the following correctly describes isaac's motion
Answers: 2
You know the right answer?
An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total...
Questions
question
History, 28.05.2021 18:10
question
Mathematics, 28.05.2021 18:10
Questions on the website: 13722361