subject
Physics, 31.12.2019 03:31 Coinda

Object a has a mass m and a speed v, object b has a mass m/2 and a speed 4v, and object c has a mass 3m and a speed v/3. rank the objects according to the magnitude of their momentum.

rank from smallest to largest. to rank items as equivalent, overlap them.

ansver
Answers: 1

Another question on Physics

question
Physics, 20.06.2019 18:04
A60-kg skier starts at the top of a 10-meter high slope. at the bottom, she is traveling 10 m/s. what is the gpe? gpe =mgh 2,880 j 5,880 j 3,000 j 1633j
Answers: 2
question
Physics, 22.06.2019 02:50
An alligator swims to the left with a constant velocity of 5 \,\dfrac{\text{m}}{\text s}5 s m ? 5, space, start fraction, m, divided by, s, end fraction. when the alligator sees a bird straight ahead, the alligator speeds up with a constant acceleration of 3 \,\dfrac{\text {m}}{\text s^2}3 s 2 m ? 3, space, start fraction, m, divided by, s, start superscript, 2, end superscript, end fraction leftward until it reaches a final velocity of 35 \,\dfrac{\text {m}}{\text s}35 s m ? 35, space, start fraction, m, divided by, s, end fraction leftward. how many seconds does it take the alligator to speed up from 5 \,\dfrac{\text {m}}{\text s}5 s m ? 5, space, start fraction, m, divided by, s, end fraction to 35 \,\dfrac{\text {m}}{\text s}35 s m ? 35, space, start fraction, m, divided by, s, end fraction?
Answers: 3
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
question
Physics, 22.06.2019 13:50
The magnitude of the poynting vector of a planar electromagnetic wave has an average value of 0.939 w/m^2 . the wave is incident upon a rectangular area, 1.5 m by 2.0 m, at right angles. how much total electromagnetic energy falls on the area during 1.0 minute?
Answers: 2
You know the right answer?
Object a has a mass m and a speed v, object b has a mass m/2 and a speed 4v, and object c has a mass...
Questions
Questions on the website: 13722363