subject
Physics, 11.11.2019 01:31 mparra4761

Aweightlifter lifts a set of weights a vertical distance of 2 meters. if a constant net force of 350 n is exerted on the weights, what is the amount of work done on the weights? :
350n multiplied by 2m = 700

**if the weightlifter in the previous question takes a total of 2 seconds to life the weights, how much power is performed

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 00:30
Orange juice has a lower or higher viscosity than chocolate syrup
Answers: 2
question
Physics, 22.06.2019 06:30
Apebble is thrown into a calm lake, ripples are formed from the center and move outward. the water particles in the lake travel in a circular pattern that moves up and down on the surface of a lake, and the energy travels a) diagonally. b) downward. c) horizontally. d) upward.
Answers: 2
question
Physics, 22.06.2019 18:30
Arailroad car collides with and sticks to an identical railroad car that is initially at rest. after the collision, the total kinetic energy of the two cars is a) the same as before. b) half as much as before. c) one third as much as before. d) one fourth as much as before. e) twice as much as before.
Answers: 1
question
Physics, 22.06.2019 19:30
Aplayground slide is 8.80 ft long and makes an angle of 25.0° with the horizontal. a 63.0-kg child, initially at the top, slides all the way down to the bottom of the slide. (a) choosing the bottom of the slide as the reference configuration, what is the system's potential energy when the child is at the top and at the bottom of the slide? what is the change in potential energy as the child slides from the top to the bottom of the slide? (include the sign of the value in your answer.)
Answers: 3
You know the right answer?
Aweightlifter lifts a set of weights a vertical distance of 2 meters. if a constant net force of 350...
Questions
question
Mathematics, 13.08.2020 06:01
question
Mathematics, 13.08.2020 06:01
Questions on the website: 13722367