subject
Physics, 05.11.2019 06:31 lfg0929

(a) calculate the work done on a 1500-kg elevator car by its cable to lift it 40.0 m at constant speed, assuming friction averages 100 n. (b) what is the work done on the lift by the gravitational force in this process? (c) what is the total work done on the lift?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 08:50
You are a sales representative for a company that makes a new alternate fuel for vehicles. you have prepared a presentation for the environmental engineers to sell your new product. what question do you expect the audience to ask regarding whether the new fuel will cause less damage to the environment? a. do we have to change any parts of the vehicle to use this alternate fuel? b. will the vehicles get better fuel mileage with the alternate fuel? c. how much greenhouse gas does your fuel produce compared with current fuel sources? d. is the alternate fuel more expensive than fossil fuel?
Answers: 2
question
Physics, 22.06.2019 14:30
Suppose that 27 j of work is needed to stretch a spring from its natural length of 6 m to a length of 9 m. (a) how much work is needed to stretch the spring from 12 m to 14 m? j (b) how far beyond its natural length will a force of 78 n keep the spring stretched?
Answers: 2
question
Physics, 22.06.2019 17:00
(a) if the pressure in gas is doubled while its volume is held constant, by what factor do (i) vrms and (ii) change? (b) is it possible to boil water at room temperature (20oc) without heating it? explain.
Answers: 3
question
Physics, 22.06.2019 17:30
Aparticle moves in a circle 1.50 m in radius . through what angle in radians does it rotate if it moves through an arc length of 2.50m? what is the angle in degrees?
Answers: 1
You know the right answer?
(a) calculate the work done on a 1500-kg elevator car by its cable to lift it 40.0 m at constant spe...
Questions
question
Mathematics, 20.04.2020 18:51
Questions on the website: 13722367