Physics, 23.10.2019 17:00 jonathanLV6231

The following data resulted from a study taken on a horizontal milling machine: pieces produced per cycle: 8 average measured cycle time: 8.36 min average measured effort time per cycle: 4.62 min average rapid traverse time: 0.08 min average cutting time power feed: 3.66 min performance rating: 115 percent allowance (machine time): 10 percent allowance (effort time): 15 percent the operator works on the job a full 8-h day and produces 380 pieces. how many standard hours does the operator earn? what is the operator’s efficiency for the 8-h day?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 21:50
Apossible explanation for a set of facts that can be tested by further investigation is called
Answers: 1
question
Physics, 22.06.2019 12:00
This is for my 8th grade science class, i really don’t understand. can someone me? , lol.
Answers: 1
question
Physics, 22.06.2019 12:30
Consider a hydrogen atom in the ground state. what is the energy of its electron? =e= jj now consider an excited‑state hydrogen atom. what is the energy of the electron in the =5n=5 level? =e5= j
Answers: 3
question
Physics, 22.06.2019 15:30
Can you match these to the correct definition
Answers: 3
You know the right answer?
The following data resulted from a study taken on a horizontal milling machine: pieces produced per...
Questions
question
Mathematics, 19.10.2021 07:10
question
Mathematics, 19.10.2021 07:10
question
Mathematics, 19.10.2021 07:20
Questions on the website: 13722361