Physics, 23.10.2019 17:00 jonathanLV6231
The following data resulted from a study taken on a horizontal milling machine: pieces produced per cycle: 8 average measured cycle time: 8.36 min average measured effort time per cycle: 4.62 min average rapid traverse time: 0.08 min average cutting time power feed: 3.66 min performance rating: 115 percent allowance (machine time): 10 percent allowance (effort time): 15 percent the operator works on the job a full 8-h day and produces 380 pieces. how many standard hours does the operator earn? what is the operator’s efficiency for the 8-h day?
Answers: 2
Physics, 21.06.2019 21:50
Apossible explanation for a set of facts that can be tested by further investigation is called
Answers: 1
Physics, 22.06.2019 12:00
This is for my 8th grade science class, i really don’t understand. can someone me? , lol.
Answers: 1
Physics, 22.06.2019 12:30
Consider a hydrogen atom in the ground state. what is the energy of its electron? =e= jj now consider an excited‑state hydrogen atom. what is the energy of the electron in the =5n=5 level? =e5= j
Answers: 3
The following data resulted from a study taken on a horizontal milling machine: pieces produced per...
Mathematics, 19.10.2021 07:10
Computers and Technology, 19.10.2021 07:10
English, 19.10.2021 07:10
Mathematics, 19.10.2021 07:10
Social Studies, 19.10.2021 07:20
Mathematics, 19.10.2021 07:20
Mathematics, 19.10.2021 07:20
Advanced Placement (AP), 19.10.2021 07:20
Mathematics, 19.10.2021 07:20
SAT, 19.10.2021 07:20
Mathematics, 19.10.2021 07:20