Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill material will be hauled to the site in 21 cy loose measure trucks. the cycle time for a truck is 40 min. per trip. the swell factor for the earth is 25% and the shrinkage factor is 10%. assume 8 hours per day and a 45-min. effective hour. determine the number of required trucks to complete the project in 32 days.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 07:00
Aball has an initial velocity of 3 m/s. if there is no friction, what is the highest it could roll?
Answers: 1
question
Physics, 22.06.2019 09:00
Infrared rays have a shorter wavelength than question 11 options: x-rays. ultraviolet rays. radio waves. gamma rays.
Answers: 1
question
Physics, 22.06.2019 09:30
True or false graphs must include scales that increase by the same amount
Answers: 1
question
Physics, 22.06.2019 10:00
(a) calculate the number of electrons in a small, electrically neutral silver pin that has a mass of 10.0 g. silver has 47 electrons per atom, and its molar mass is 107.87 g/mol. (b) imagine adding electrons to the pin until the negative charge has the very large value 1.00 mc. how many electrons are added for every 109 electrons already present
Answers: 3
You know the right answer?
Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill ma...
Questions
question
Chemistry, 30.05.2021 01:00
question
Chemistry, 30.05.2021 01:00
question
Chemistry, 30.05.2021 01:00
Questions on the website: 13722360